Documents › 7f66e395837cac28f0dc322c0252403ff1a7e1c9:21-220
342 - 11.30.23_Transcript_Commission
About this document
- Layer
- packet: an item in a POST meeting packet
- Type as titled
- transcript (kind from title)
- File
- 7f66e395837cac28f0dc322c0252403ff1a7e1c9 application/pdf
- Cases
- none: board business or reference material
Page 58 · file page 78
larger image
Text: digital text layer
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
POST Commission Meeting, November 30, 2023
KATHRYN S. SWANK, CSR, RPR (916) 390-7731
58
with the student. Because if it's going to take some
time to get through the emergency, it's taking away from
the certified hours that the course is actually supposed
to be instructed.
Next slide.
A big, big problem that we're seeing lately is Work
Sample Test Battery equipment. We're seeing that the
34-inch obstacle is not to scale. The walls, the 6-foot
solid wall and the 6-foot chain-link fence we're seeing
is not as wide as it should be. It should be 7 feet
wide, and we're seeing a lot of it 5 feet to 6 feet wide
only. And we're documenting all these things.
And I want to point out that Anita Fenner is
actually modifying our Work Sample Test Battery Proctor
Manual at this time. There's a lot of gray areas in
that manual that we're getting calls from presenters all
the time not understanding what the 2012 version is. So
we're working really hard to clear up that mud so that
presenters can actually facilitate these tests the way
they should be done.
Unapproved or modified test forms. So we have test
evaluation forms that is utilized by, I would say,
95 percent of the presenters in the state of California.
However, we see that some presenters are actually
modifying it to document scores, and that is not the
78
Keys: ← → or j k turn pages; / finds.